Under the 433 Agreement the drainage basins, pipes in and leading from the road to the basins will have easements. All easements shall have written legal descriptions dedicated to the drainage district.
All legal easements shall be prepared by the project surveyor and/or engineer. All costs and recording fees for the on-site or off-site easements will be paid by the Owner/Developer.
The minimum size of the underground pipe drainage easements will be twenty (20) feet centered on the pipe. The minimum size of an open ditch drainage easement shall be fifty (50) feet centered on the ditch.
The Water Resources Commissioner reserves the right to require a wider easement if the situation warrants it.
No permanent building or trees will be permitted on easements or rights-of-way without the express written permission of the Water Resources Commissioner.